Connect-Tek USB-16 Manuel d'utilisateur Page 30

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 44
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 29
Host High Speed Electrical Test Procedure Revision 1.4
6. On the Host Test menu, select SUSPEND from the Port Control dropdown menu and enter the
port number. Click Execute once to place the port into suspend. The captured suspend
transition should appear as in the following figure.
Figure 18: Device Enters Suspend
7. The result contains EL_39, which is the time interval from the end of last SOF packet issued by
the host to when the device attached its full speed pull-up resistor on D+ (transition to full
speed J-state). This time should be between 3.000 ms and 3.125 ms.
8. Select the High Speed measurement tab> More > Resume measurement.
9. Set the input Signal Direction and run the measurements.
30
Vue de la page 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 43 44

Commentaires sur ces manuels

Pas de commentaire